ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG2_RL2 / TSGR2_109bis-e / Inbox / Drafts / [Offline-034][DCCA] NR-NR DC (Huawei) / [Phase 2] Draft Reply LS

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon R2-200xxxx_Draft LS to RAN1 on uplink power control for NR-NR Dual-Connectivity.doc 2020/04/27 0:14 85,5 KB
icon R2-200xxxx_Draft LS to RAN1 on uplink power control for NR-NR Dual-Connectivity-v1 ZTE.doc 2020/04/27 1:32 92 KB

2 items.